Fire safety
Extinguishers, hydrants and hose reels, by fire class and floor area.
IS 2190The advisor for designing safe, secure and smart premises. Stop hunting through code books. Start designing to them.
For engineers, consultants and facility teams. Every answer cites the standard and clause, so a qualified professional can verify it and sign off.
Fire safety · Smoke detection · Sprinkler systems · Water leakage
Security cameras · Webcams · Video monitoring · Access control
Automatic lighting · Power saving · Industrial automation · Building management
BuildVisor is an advisor for the three systems every building runs on. Ask what yours is required to have, and get the answer with the clause behind it.
Fire and life safety, specified against the standard that governs your building rather than against habit.
Answers what your building is required to have, with the standard and the clause behind it.
Extinguishers, hydrants and hose reels, by fire class and floor area.
IS 2190Detection and alarm, spaced to ceiling height and compartment.
IS 2189Suppression and deluge, and the height they stop being optional.
IS 15105Leak detection and isolation for plant rooms, risers and wet areas.
Site specificEvery one of these is a question you can ask, and an answer that arrives with its source.
Ask about your buildingDetection, suppression, containment and leak protection, specified against the standard that governs your building.
Detection, suppression, containment and leak protection, specified against the standard that governs your building.
Upload a floor plan or a fire protection layout. BuildVisor reads what is on the drawing and pulls it into a table you can check and export.
It reads what is already drawn. Deciding what should be drawn stays with your professional.
| Zone | Device | Count |
|---|---|---|
| Open office | Smoke detector | 12 |
| Open office | Sprinkler head | 34 |
| Server room | Clean agent nozzle | 4 |
| Corridor | Manual call point | 3 |
| Stair A | Hose reel | 1 |
| Basement | Hydrant | 2 |
Class A, B, C, D, E and F each take a different agent. CO2 for live electrical, wet chemical for cooking oil.
At least one unit of 1A rating per 200 sq m of floor area, minimum one per floor.
Measured to the handle, with the base clear of the floor and the unit on a bracket or stand.
What spacing applies to smoke detectors on a flat 4 m ceiling in an open office?
The answer appears here, in plain English, with the figure the standard actually gives.
NBCS 2026 replaced NBC 2016 at BIS level in April 2026. Most state bye laws still refer to the older edition, and states such as Karnataka and Tamil Nadu add their own requirements on top. BuildVisor keeps the editions apart, tells you which one is current at BIS level, and lets you work to whichever one your approval authority is actually asking for.
Still referenced by most state bye laws
The clause text for this edition appears here, so you can read both side by side.
The clause text for this edition appears here, so you can read both side by side.
Who is on site, what they are doing, and what the record shows afterwards. Read off the same drawing as the fire layer.
How many cameras a perimeter needs depends on what each one can actually see. A bundle of six is a price, not an answer.
AI detection cameras pick up flame and smoke in vision as well as movement. One install, two duties, which is why this layer belongs next to the fire layer rather than in a separate quote.
Retention, who can pull a clip and when it is deleted carry rules under India's Digital Personal Data Protection Act 2023. Settle them before the system goes in, not after an incident.
Lighting that follows occupancy, power that follows schedule, and plant that runs itself. This is the shape that architecture takes.
A control loop that has to cross a link to a data centre and back is a control loop with a single point of failure in someone else's building.
Occupancy checked against daylight, a meter checked against the schedule it should be following. Cross-checking is what separates a real change from a blip.
The record that goes off site is the event, not the raw feed. That is a bandwidth decision and a privacy one at the same time.
The engineer who needs the clause, the professional who signs the drawing, and the manufacturer whose product ends up specified. Each one arrives for a different reason.
Reach the clause in seconds instead of minutes. Spend your time on the judgement call, not on finding the page.
Know what your building is required to have, before an inspection tells you.
Size and specify systems with the standard open next to you, and see the equipment options in the same window.
Check fire and life safety requirements while the design is still cheap to change.
The questions architects, developers and fire consultants actually ask us first.
No. It is an engineering aid. Approval rests with your local authority and accountability rests with the qualified professional who signs the design.
The open Indian Standards for detection, suppression, pumps and extinguishers, along with the National Building Code. The library is growing, and you can request a standard from inside the product.
Yes. You choose the edition, and answers stay inside it.
Not in the free version. Licensed content stays with the professional who holds the licence, in a private library on their own account.
No.
Yes, on premise and fully air gapped deployments are available.
No. It gets you to the clause faster and, when you need a professional, it helps you find one.
No. It tells you what the standard requires, including type, rating, quantity and mounting height. Where each item sits on the drawing is a design decision that stays with your professional.
Send the drawing instead. You will get the answer applied to your own project.
No demo call required first. Share a single drawing and we will return a marked-up plan and a compliance gap list, so you can judge the output on your own project rather than on a sales deck.