IndiaThe AI knowledge layer for fire and life safety design in India.

Fire safety codes, answered with the clause.

The advisor for designing safe, secure and smart premises. Stop hunting through code books. Start designing to them.

For engineers, consultants and facility teams. Every answer cites the standard and clause, so a qualified professional can verify it and sign off.

AcrossCommercialIndustrialResidentialinfrastructure
The three S approach

Safe, secure and smart premises, advised from the standard up.

BuildVisor is an advisor for the three systems every building runs on. Ask what yours is required to have, and get the answer with the clause behind it.

The systems that protect life and property

Fire and life safety, specified against the standard that governs your building rather than against habit.

What BuildVisor does here

Answers what your building is required to have, with the standard and the clause behind it.

Fire safety

Extinguishers, hydrants and hose reels, by fire class and floor area.

IS 2190

Smoke detection

Detection and alarm, spaced to ceiling height and compartment.

IS 2189

Sprinkler systems

Suppression and deluge, and the height they stop being optional.

IS 15105

Water leakage

Leak detection and isolation for plant rooms, risers and wet areas.

Site specific

Every one of these is a question you can ask, and an answer that arrives with its source.

Ask about your building
S1 · Safety

Fire safety, specified from the standard.

Detection, suppression, containment and leak protection, specified against the standard that governs your building.

level-03.dwgFree plan audit · example markup
RECEPTIONOPEN OFFICESERVERSTAIRSTOREPANTRYWORKSTATIONSABCABCSMOKE × 2 · IS 2189CO₂EXITGAP 24.6 mR 23 m · IS 2190
ExtinguisherDetection · EgressCoverage gapStructure
Reads what is already drawn
01 / 05Keep scrolling, this section has 5 parts
Read the drawing

Upload a floor plan or a fire protection layout. BuildVisor reads what is on the drawing and pulls it into a table you can check and export.

Alpha
Component and device identification
Zone by zone counts
Equipment schedule extraction
Export to a table

It reads what is already drawn. Deciding what should be drawn stays with your professional.

level-04.dwg, extracted
ZoneDeviceCount
Open officeSmoke detector12
Open officeSprinkler head34
Server roomClean agent nozzle4
CorridorManual call point3
Stair AHose reel1
BasementHydrant2
What the standard asks for
Type
By fire class

Class A, B, C, D, E and F each take a different agent. CO2 for live electrical, wet chemical for cooking oil.

Capacity
1 unit per 200 sq m

At least one unit of 1A rating per 200 sq m of floor area, minimum one per floor.

Height
1.0 m to 1.5 m

Measured to the handle, with the base clear of the floor and the unit on a bracket or stand.

Cited from IS 2190Deciding where it goes on your drawing stays with the professional who signs the design.
Answered with the clause
Example answerPending verification

What spacing applies to smoke detectors on a flat 4 m ceiling in an open office?

The answer appears here, in plain English, with the figure the standard actually gives.

IS 2189, Clause 0.0, p. 00
Indexed and searchable, with clause level citations
IS 2189Fire alarm and detection
IS 15105Sprinkler systems
IS 15325Water spray and deluge
IS 15301Fire pumps
IS 15493Clean agent suppression
IS 2190Portable extinguishers
NBC Part 4Fire and life safety
State fire rulesYour approval authority
Which edition applies

NBCS 2026 replaced NBC 2016 at BIS level in April 2026. Most state bye laws still refer to the older edition, and states such as Karnataka and Tamil Nadu add their own requirements on top. BuildVisor keeps the editions apart, tells you which one is current at BIS level, and lets you work to whichever one your approval authority is actually asking for.

NBC 2016

Still referenced by most state bye laws

Same requirement, this edition

The clause text for this edition appears here, so you can read both side by side.

NBCS 2026

Current at BIS level
Same requirement, this edition

The clause text for this edition appears here, so you can read both side by side.

S2 · Security

The systems that watch the premises.

Who is on site, what they are doing, and what the record shows afterwards. Read off the same drawing as the fire layer.

level-03.dwgsecurity and access layersAlpha · example drawing
RECEPTIONOPEN OFFICESERVERSTAIRSTOREPANTRYWORKSTATIONSCONTROLLED DOORS × 4Arcs are read from the schedule as drawn, not recalculated
Camera and coverageControlled door7 cameras · 4 controlled doors
Sightlines

Sized to the site, not to a package

How many cameras a perimeter needs depends on what each one can actually see. A bundle of six is a price, not an answer.

One lens, two jobs

The camera watching for intruders can watch for smoke

AI detection cameras pick up flame and smoke in vision as well as movement. One install, two duties, which is why this layer belongs next to the fire layer rather than in a separate quote.

The record

Footage is personal data

Retention, who can pull a clip and when it is deleted carry rules under India's Digital Personal Data Protection Act 2023. Settle them before the system goes in, not after an incident.

The boundaryNo Indian Standard governs where a camera goes the way IS 2190 governs an extinguisher. BuildVisor says so rather than inventing one.
S3 · Smart

One controller between the signals and everything they trigger.

Lighting that follows occupancy, power that follows schedule, and plant that runs itself. This is the shape that architecture takes.

Smart layer · schematicWhat BuildVisor advises on
CLOUD · EVENTS ONLYOCCUPANCYDAYLIGHTENERGY METERPLANT SENSORFIRE PANELLIGHTING CIRCUITSHVAC AND PLANTMETERING RECORDONE BMS VIEWCONTROLLERon the premisesFire panel is an interlock the smart layer respects, not an output it drives
Signals inControllerActions out
On the premises

Decisions stay in the building

A control loop that has to cross a link to a data centre and back is a control loop with a single point of failure in someone else's building.

Two signals

One reading is not an event

Occupancy checked against daylight, a meter checked against the schedule it should be following. Cross-checking is what separates a real change from a blip.

Events only

What leaves the building

The record that goes off site is the event, not the raw feed. That is a bandwidth decision and a privacy one at the same time.

The boundaryBuildVisor advises on these components and the standards that govern them. It is not the controller in the middle, and it does not operate your building.
Who it is for

One library, three desks around it.

The engineer who needs the clause, the professional who signs the drawing, and the manufacturer whose product ends up specified. Each one arrives for a different reason.

01

Fire safety consultants and officers

Reach the clause in seconds instead of minutes. Spend your time on the judgement call, not on finding the page.

02

Facility, EHS and safety managers

Know what your building is required to have, before an inspection tells you.

03

Contractors and system integrators

Size and specify systems with the standard open next to you, and see the equipment options in the same window.

04

Architects and MEP designers

Check fire and life safety requirements while the design is still cheap to change.

FAQ

Straight answers.

The questions architects, developers and fire consultants actually ask us first.

No. It is an engineering aid. Approval rests with your local authority and accountability rests with the qualified professional who signs the design.

The open Indian Standards for detection, suppression, pumps and extinguishers, along with the National Building Code. The library is growing, and you can request a standard from inside the product.

Yes. You choose the edition, and answers stay inside it.

Not in the free version. Licensed content stays with the professional who holds the licence, in a private library on their own account.

No.

Yes, on premise and fully air gapped deployments are available.

No. It gets you to the clause faster and, when you need a professional, it helps you find one.

No. It tells you what the standard requires, including type, rating, quantity and mounting height. Where each item sits on the drawing is a design decision that stays with your professional.

Still holding a question this page didn’t answer?

Send the drawing instead. You will get the answer applied to your own project.

Get a free plan audit
Free plan audit

Send us one floor plan. Get the gap report free.

No demo call required first. Share a single drawing and we will return a marked-up plan and a compliance gap list, so you can judge the output on your own project rather than on a sales deck.

  • Marked-up drawing with placement and coverage
  • Clause-cited gap report, ranked by severity
  • Indicative bill of quantities
  • Your file deleted on request, always under NDA if you prefer

We reply within one working day. No newsletter, no reselling your details.

Free plan audit